Alcohol Burner

Ideal for all hot melt adhesive applications. Use denatured alcohol.
|
Alcohol Burner Extra Wicks
Replacement wick for our alcohol burner. Sold each.
|
Bohning Cresting Kit

Here is everything you need to finish the job. Kit Includes: 300 rpm Standard
Crester, dip tube, 16 oz. Fletch-Lac Thinner, 6 cresting colors, paint caddy, 8
oz. white lacquer, set of arrow holders, 2 camel hair brushes, 16 oz. of SSR
shaft cleaner, and Arrow Building DVD.
|
Feather-Dri

Water repellent powder for feathers. Simply shake feathers around in powder
and go. Colorless, odorless and will not affect feather adhesion.
|
Feather Fletching Tape

Easily applied, creates a strong ad reliable bond on contact. Will fletch
over 3 1/2 dozen arrows.
Feather Clamp Time: On contact
Directions: Apply tape to feather quill. Trim with scissors, leave 1/8" overhang
on each end. Remove tape backing. Press feather firmly onto arrow shaft. Make
sure base fully contacts shaft.
|
Ferr-L-Tite

Hot melt cement, heat reversible. Tough elastic, waterproof bond that adheres
points and inserts to aluminum or wood shafts. Stick.
Cure Time: 24 Hours
Directions: Using an open flame heat adhesive. Apply to insert. Install insert
and rotate one full turn. Wipe excess adhesive from shaft.
|
Fletch-Tite Regular

Solvent based fletching adhesive. Remains flexible, water repellent and shock
resistant. Bonds feathers, vanes and nocks to aluminum and wood. Chemically
engineered to work with Bohning paints. 3/4 oz tube.
Vane Clamp Time: 5-7 Minutes
Feather Clamp Time: 20-30 Minutes
Directions for Fletching: Apply thin bead to vane of feather base. Place
fletching. Make sure base fully contacts shaft.
Directions for Nocks: Apply small amount to nock. Install nock and rotate one
full turn.
Fletch- Tite™ tubes have a shelf life of 2 years form the date of manufacture.
|
Fletch-Tite Platinum

Works on all shaft types. Platinum provides you with an incredible bond with
cedar, fiberglass, aluminum, or carbon shafts. 3/4 oz tube.
Vane Clamp Time: 2-3 Minutes
Feather Clamp Time: 15-20 Minutes
Directions for Fletching: Apply thin bead to vane or feather base.
Place fletching. Make sure base fully contacts shaft.
Directions for Nocks: Apply small amount to nock. Install nock and rotate one
full turn.
|
Tex-Tite String Wax

A natural-based wax that lubricates and lengthens string life. Tex-Tite will
remain tacky and will not become sticky under any weather conditions.
|
String Whiskers

String whiskers are a proven method of dampening string noise and
oscillations, simply tie onto bowstring.
|
Thread-Tite

Easy to apply. Keeps points from backing out.
|
Wind-Check

A fine, odorless powder. Will detect even the slightest air currents, Enough
for 250 applications. Environmentally safe.
|
Zero Let Off® String Keepers

We make these here in our shop- keep your string handy and straight during
transport and storage. Assorted colors and styles, our choice.
|
|